Focus on multiple fields, fibre-optic laser cutters, carving machines, sculptors, carvings.
The main axis is preheating.
When the main axle is activated for the first time in a day, let it heat up slowly, so that the bearing reaches its operational temperature and the cone expands evenly.
Recommended use of heat machine (no actual process-free)
1.
Let's get the main axle up.
9000rpm
Run.
3-5
Minutes;
2.
12,000rpm
3.
18000rpm
Notes:
When the equipment has been suspended for some time and the temperature has fallen to ambient temperatures, preheat the main axis before processing.
Every day, slashing equipment regularly inspects the discharge of the water in the glass of the oil and water branch and on the air press so as to prevent water from entering the main axis.
Created:
2020-11-20
Browser:
Collection
Previous:
The last:
The article describes common issues. Exact troubleshooting, parts, adjustments and machine solutions depend on the machine model and actual operating conditions.